Overhead Cranes & Hoists

Overhead bridge cranes, gantry cranes and monorail hoists move heavy parts in shops, plants and warehouses. Dropped loads and crushing are the main hazards.

Photo: operator using a pendant control with the load just above the floor

Before each shift

Types

Inspections

InspectionWhen
Pre-shift (operator)Every shift: controls, limits, hooks, rope or chain, brakes
FrequentDaily to monthly, depending on service
PeriodicEvery 1 to 12 months, with a full check of structure, wheels, brakes, electrical and hoist
Wire ropeThorough inspection at least monthly with a signed record
Load testAfter installation, extensive repair or alteration

Operating

Pinch points and landing loads

See Rigging Basics and Below-the-Hook Devices.

Maintenance: lock out the crane’s power and use warning signs before working on the runway, bridge or hoist. See Lockout/Tagout.

Video: overhead crane pre-shift inspection

Standards & references

  • 29 CFR 1910.179: Overhead and gantry cranes
  • ASME B30.2 (overhead cranes), B30.16 (overhead hoists)